Projects

civil and building construction companies
Project 1

Bayswater Station

Model

Client

Project Details

Contract Engineer placed with Subcontractor performing the Concrete Scope

DCL Contracting

The new Bayswater Station will be a pivotal METRONET hub, connecting the Midland, Airport, and Morley-Ellenbrook lines. This will provide more travel options to Perth Airport, the Swan Valley region, and the central business district. With seamless integration into bus services and the Principal Shared Path network, the station will significantly enhance connectivity throughout Perth.

A CEPM Contract Engineer has joined the subcontractor team handling the concrete work on a high-profile infrastructure project. As the on-site engineer for our client, we are responsible for:

  • Safety
  • Quality management
  • Cost control
  • Logistics
  • Site supervision activities including SQE audits
Project 2

Claremont Station

Model

Client

Project Details

CEPM contracted to Head Contractor

John Holland

The multi-million dollar upgrade at Claremont Station will improve the passenger experience, boost service frequency, and provide direct access to the Forrestfield-Airport Link. With the opening of the Forrestfield-Airport Link, passengers traveling between Claremont and Bayswater stations will enjoy five-minute service intervals during peak times. CEPM's skilled contractors provided essential Construction Management and Design Engineering support to the Head Contractor, ensuring the project's success.

In the construction manager capacity, CEPM’s senior engineer was responsible for:

  • Client engagement
  • Methodology review and client approval for a single-sided concrete wall to be constructed in the rail reserve during live train operations
  • Subcontractor contract management of road and pedestrian shared path works to main roads standards
  • Head contract management
  • Community engagement
  • Delivery and opening of a new underpass structure
  • Rail shutdown maintenance and construction activities

In the design engineering capacity, CEPM’s contractor was responsible for the delivery of:

  • Design of the MCR alignment to suit site conditions
  • Design management of bus interchange and road construction

CEPM’s contractors ensured there was a strong focus on a secure and efficient delivery of the project. Their dedication to detail and commitment to excellence resulted in a high-quality product for the client.

civil project management
civil and building construction companies
Project 3

Sydney Metro Western Sydney Airport

Model

Client

Project Details

CEPM engaged by the subcontractor to undertake tendering, contract review, and execution of two packages of works.

East to West Plant Services

The Western Sydney Airport line, formerly Sydney Metro Greater West, is a 23-kilometre Sydney Metro line currently under construction. It will run from St Marys, connecting to the Main Western railway line, to Badgerys Creek Aerotropolis via Western Sydney Airport. This line is designed to provide efficient public transport for the new Western Sydney Airport.

A CEPM senior engineer led the tender on behalf of a subcontractor for two separate scopes of work:

  • External enabling works. This scope included road works, demolition of existing infrastructure, establishment of easements, utility relocation, and landscaping.
  • Orchard Hills Station box excavation (currently underway). This scope includes the supervision and execution of the excavation of a 155,000m3 station box used to launch two tunnel boring machines.

A CEPM senior engineer led the tender on behalf of a subcontractor for two separate scopes of work:

  • Pricing and presentation to the client prior to submission,
  • Methodology development proposals and options,
  • Program and first principals assessment of production rates,
  • Analysis of geotechnical drawings and reports,
  • Submission coordination.
Project 4

Baldivis Wastewater Pump Station

Model

Client

Project Details

CEPM contract engineer and construction manager tendered and delivered the enabling works packageworks.

East to West Plant Services

 The water corporation is building new wastewater infrastructure to support ongoing growth in Baldivis, located in the City of Rockingham.

This project includes

  • A new below-ground wastewater pump station
  • Overflow storage
  • Two short sections of wastewater pipeline

CEPM led the tender development, management, and submission services for our client. Following the successful tender, we were re-engaged to oversee the project from a construction management perspective, responsible for:

  • Contract review and negotiation
  • Methodology development for client approval
  • Risk assessment development and approval
  • Cost tracking and control
  • Plant selection
  • Workforce engagement and inductions
  • Management of subcontractors and suppliers
  • Procurement
  • Demobilisation and contract closeout
Contact Us

Let’s Discuss Your

Project

Get in touch
Speak to our experts.
resourcing@cepm.com.au
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Ready to discuss your project?

At CEPM, we specialise in delivering safe, efficient, and high-quality solutions for civil construction projects across Australia's West and East Coasts.

CEPM © 2024. All rights reserved.